Engineered formwork and shoring towers supporting a cast-in-place concrete slab on a large construction site

Temporary Works Engineering

Engineering for Every Stage of Construction

Formwork, shoring, scaffolding, temporary supports and construction-stage stability — engineered around how the structure is actually built.

Introduction

Temporary Structures, Permanent Consequences

Temporary works exist only during construction, yet they carry significant loads and often govern how a structure can be built, accessed and modified.

Element Consulting Engineers provides temporary works engineering for contractors, formwork and scaffold suppliers, construction managers and project teams. We work as the engineering consultant — analysis, design, drawings, coordination and field support — not as a supplier or installer.

Every design considers the temporary system together with the structure supporting it, the construction sequence and the conditions on site.

Reshoring props supporting a concrete slab in a multi-storey structure under construction

Capabilities

Temporary Works Services

Engineered wall formwork panels with steel walers and tie rods on a cast-in-place concrete structurePlaceholder Image

01

Formwork Engineering

Engineering of formwork systems and their supporting components for cast-in-place concrete construction.

  • Slab and beam formwork
  • Wall and column formwork
  • Formwork support systems
  • Concrete placement and fresh-concrete pressure
  • Local support conditions
  • Formwork-related structural checks
Reshoring props supporting a concrete slab in a multi-storey structure under constructionPlaceholder Image

02

Shoring & Reshoring

Analysis and design of shoring and reshoring arrangements that support structures while concrete gains strength.

  • Slab shoring
  • Reshoring and backshoring
  • Prop and tower layouts
  • Load distribution between levels
  • Construction-stage loading
  • Supporting structure capacity checks
System scaffold with repeating steel tube grid erected against a concrete building under constructionPlaceholder Image

03

Scaffolding Engineering

Structural engineering for scaffold systems used for access, enclosure, protection and temporary support.

  • Access scaffolding
  • Supported and suspended scaffolds
  • Cantilevered and bridged conditions
  • Loading platforms and material loading
  • Tie and anchorage requirements
  • Support reactions on the structure
Steel temporary bracing and props installed to support an existing concrete structure during alterationPlaceholder Image

04

Temporary Supports & Bracing

Engineering for temporary supports required during construction, alteration, repair and installation work.

  • Temporary props and support frames
  • Strongbacks and temporary beams
  • Lateral bracing
  • Load transfer and shoring of openings
  • Support during structural modifications
  • Installation-stage support
Engineer reviewing drawings on site beside shoring and scaffolding on an active concrete structurePlaceholder Image

05

Construction-Stage Stability

Assessment of stability where the permanent structural system is incomplete, altered or temporarily loaded.

  • Partially completed structures
  • Temporary lateral stability
  • Construction sequencing
  • Removal of structural components
  • Temporary load paths
  • Construction equipment and material loads

Our Standard

Temporary Works That Work in the Field

A temporary works design is only useful if it can be installed, inspected and worked around on an active site.

01

Safe

Designs based on defined loads, load paths and capacities, with the supporting structure considered as part of the system.

02

Buildable

Solutions developed with regard to available materials, equipment, access and installation sequence.

03

Coordinated

Engineering aligned with the permanent design, the construction schedule and the trades responsible for installation.

04

Field-Focused

Clear drawings and documentation, with engineering support available as conditions change on site.

Where We Are Engaged

Engineering for Complex Construction Conditions

Temporary works often involve project-specific constraints that cannot be addressed by standard details alone.

Restricted Site Access

Temporary works arranged around limited working space, existing operations, traffic or adjacent structures.

Existing Structures

Support and stabilization where original capacity, condition or documentation is uncertain.

Irregular Geometry

Transfer slabs, sloped and stepped conditions, cantilevers and non-standard layouts.

Heavy Construction Loads

Equipment, material storage and concentrated reactions applied to slabs and supporting elements.

Accelerated Schedules

Early stripping, reshoring cycles and staged construction that require careful load assessment.

Sequenced Demolition & Alteration

Openings, removals and modifications requiring temporary load paths before permanent work is complete.

Project Support

Engineering Support From Design Through Construction

01

Analysis & Design

Load paths, stability checks and design of the temporary system and its supporting structure.

02

Engineering Drawings

Clear, site-ready drawings that communicate geometry, loads, connections and installation intent.

03

Engineering Review & Seal

Independent review of submitted designs, calculations and documentation sealed by a qualified engineer.

04

Field Reviews & Support

Observation and guidance as conditions evolve, with practical responses to site-specific issues.

Projects

Related Temporary Works Project Experience

Selected projects that illustrate the breadth of ECE engineering work.

North Shore Wastewater Treatment Plant — FormworkFormwork

North Shore Wastewater Treatment Plant

North Vancouver, British Columbia

Formwork and shoring engineering, temporary works inspections and construction support for major wastewater treatment infrastructure.

View Project
Broadway Subway Project — FormworkFormwork

Broadway Subway Project

Vancouver, British Columbia

Formwork engineering, temporary works and construction-stage structural support for major transit infrastructure.

View Project
Surrey–Langley SkyTrain Extension — FormworkFormwork

Surrey–Langley SkyTrain Extension

Surrey–Langley, British Columbia

Formwork and construction engineering support for staged rapid-transit infrastructure construction.

View Project
View All Projects
Concrete bridge structure supported by shoring and scaffolding at dusk

Start a Conversation

Have a Temporary Works Challenge?

Tell us about the structure, the construction sequence and the site conditions. Our team would be pleased to discuss the temporary works engineering your project requires.