Project Overview

Temporary Works for Complex Concrete Construction

Element Consulting Engineers provides formwork and shoring engineering and inspection services supporting construction of the North Shore Wastewater Treatment Plant.

ECE's involvement addresses temporary support systems, construction loading and field conditions associated with major concrete infrastructure.

North Shore Wastewater Treatment Plant — project context

Project Information

Sector
Water & Wastewater
Location
North Vancouver, British Columbia
Primary Service
Formwork & Temporary Works
Client / Partner
PCL Construction
Categories
Formwork, Temporary Works, Construction Engineering, Water & Wastewater

Engineering Challenge

Large Walls, Large Pressures

Water and wastewater structures are built from large cast-in-place concrete walls and slabs. Form pressures, bracing reactions, wall penetrations and placement sequencing all govern what the temporary systems have to resist.

Our Scope

OUR ENGINEERING SCOPE

01 — Formwork Engineering

Engineering associated with formwork systems and supporting arrangements for concrete construction.

02 — Shoring Design

Design and assessment of temporary support systems required during construction.

03 — Construction Loading

Assessment of temporary loads associated with concrete placement and construction operations.

04 — Temporary Load Paths

Evaluation of how construction-stage loads are transferred through temporary and permanent supporting elements.

05 — Field Review

Inspection and engineering support associated with temporary works implementation.

Engineering Solution

Engineered Formwork and Support Systems

ECE provided formwork and shoring engineering, assessment of construction loading and load transfer, and inspection of temporary works during installation and use.

Formwork & Shoring

Supporting the Structure While It Takes Shape

Concrete construction depends on temporary structural systems before the permanent structure can support itself. Formwork, shoring and supporting elements must transfer construction loads while accommodating the geometry, sequence and practical constraints of the work.

  1. 01

    Concrete Load

  2. 02

    Formwork System

  3. 03

    Shoring System

  4. 04

    Supporting Structure

Engineering Considerations

Conditions Addressed by the Engineering

Form Pressures & Loads

Shoring & Support

Load Transfer

Field Conditions

Gallery

PROJECT GALLERY

More Work

Related Projects

Broadway Subway Project — FormworkFormwork

Broadway Subway Project

Vancouver, British Columbia

Formwork engineering, temporary works and construction-stage structural support for major transit infrastructure.

View Project
Pattullo Bridge Replacement Project — FormworkFormwork

Pattullo Bridge Replacement Project

Surrey–New Westminster, British Columbia

Formwork design review, temporary works verification and field inspection support for construction of the new bridge crossing.

View Project
Granville Island Public Market — ScaffoldingScaffolding

Granville Island Public Market

Vancouver, British Columbia

Engineering and inspection of a full temporary roof and scaffold system over the active Granville Island Public Market.

View Project

Start a Conversation

Planning Complex Concrete Construction?

Tell us about the structure, construction sequence and temporary systems. Our team can help assess the engineering requirements and develop a practical approach for the work.