01 — Construction Load Assessment
Structural assessment of temporary loads associated with construction activities, equipment and material staging.

Infrastructure & Transit
Formwork, Falsework & Temporary Works
Construction engineering and temporary works support for major transit infrastructure in Vancouver, British Columbia.
Vancouver, British Columbia
Project Overview
Element Consulting Engineers has provided construction engineering and temporary works support associated with construction of the Broadway Subway Project.
ECE's involvement includes engineering for temporary works, formwork and construction-stage structural conditions, together with field review and engineering support during implementation.

Project Information
Engineering Challenge
Underground transit structures combine deep concrete elements, complex geometry and restricted working space. Wall forms, falsework, bracing and stair formwork must all be supported and restrained while the permanent structure is incomplete.
Our Scope
01 — Construction Load Assessment
Structural assessment of temporary loads associated with construction activities, equipment and material staging.
02 — Shoring & Reshoring
Engineering assessment of temporary support and load transfer during staged concrete construction.
03 — Formwork Support
Structural engineering associated with formwork systems, supporting structures and concrete placement conditions.
04 — Temporary Works
Engineering of temporary structural arrangements required to facilitate construction activities.
05 — Structural Assessment
Assessment of permanent structural elements subjected to temporary or construction-stage loading conditions.
06 — Field Engineering
Field reviews and engineering response to conditions encountered during construction.
Engineering Solution
ECE engineered and reviewed the temporary systems used to build these elements — formwork and falsework arrangements, bracing, shoring and construction-stage support — and provided field engineering as conditions developed on site.
Construction-Stage Engineering
During construction, the structural system may behave differently from its final design condition. Permanent elements may be incomplete, temporary supports may alter load paths and construction operations can introduce concentrated loads that require dedicated structural assessment.
Understand the Operation
Define the Condition
Trace the Load Path
Develop the Solution
Engineering Considerations
Assessment of temporary equipment loads and concentrated reactions.
Assessment of structural conditions associated with staged concrete work.
Engineering for shoring, reshoring and temporary support arrangements.
Engineering response to construction sequences, localized loads and field conditions.
Gallery
Related Services
Engineering for the conditions that exist while a structure is being built.
Shoring, reshoring, formwork, access and temporary support systems.
Formwork systems, supporting arrangements and concrete placement conditions.
Site reviews, field engineering support and project-specific services.
More Work
FormworkSurrey–New Westminster, British Columbia
Formwork design review, temporary works verification and field inspection support for construction of the new bridge crossing.
View Project
FormworkNorth Vancouver, British Columbia
Formwork and shoring engineering, temporary works inspections and construction support for major wastewater treatment infrastructure.
View Project
FormworkSurrey–Langley, British Columbia
Formwork and construction engineering support for staged rapid-transit infrastructure construction.
View ProjectStart a Conversation
Tell us about the structure, construction sequence, equipment and temporary conditions. Our team can help assess the engineering requirements and develop a practical approach for the work.