Broadway Subway Project
All Projects

Infrastructure & Transit

Broadway Subway Project

Formwork, Falsework & Temporary Works

Construction engineering and temporary works support for major transit infrastructure in Vancouver, British Columbia.

Vancouver, British Columbia

Project Overview

Supporting Complex Construction Conditions

Element Consulting Engineers has provided construction engineering and temporary works support associated with construction of the Broadway Subway Project.

ECE's involvement includes engineering for temporary works, formwork and construction-stage structural conditions, together with field review and engineering support during implementation.

Broadway Subway Project — project context

Project Information

Sector
Infrastructure & Transit
Location
Vancouver, British Columbia
Primary Service
Formwork, Falsework & Temporary Works
Categories
Formwork, Temporary Works, Construction Engineering, Infrastructure & Transit

Engineering Challenge

Underground Construction, Constrained Geometry

Underground transit structures combine deep concrete elements, complex geometry and restricted working space. Wall forms, falsework, bracing and stair formwork must all be supported and restrained while the permanent structure is incomplete.

Our Scope

OUR ENGINEERING SCOPE

01 — Construction Load Assessment

Structural assessment of temporary loads associated with construction activities, equipment and material staging.

02 — Shoring & Reshoring

Engineering assessment of temporary support and load transfer during staged concrete construction.

03 — Formwork Support

Structural engineering associated with formwork systems, supporting structures and concrete placement conditions.

04 — Temporary Works

Engineering of temporary structural arrangements required to facilitate construction activities.

05 — Structural Assessment

Assessment of permanent structural elements subjected to temporary or construction-stage loading conditions.

06 — Field Engineering

Field reviews and engineering response to conditions encountered during construction.

Engineering Solution

Engineering for Each Construction Stage

ECE engineered and reviewed the temporary systems used to build these elements — formwork and falsework arrangements, bracing, shoring and construction-stage support — and provided field engineering as conditions developed on site.

Construction-Stage Engineering

The Structure Must Work Before It Is Finished

During construction, the structural system may behave differently from its final design condition. Permanent elements may be incomplete, temporary supports may alter load paths and construction operations can introduce concentrated loads that require dedicated structural assessment.

  1. 01

    Understand the Operation

  2. 02

    Define the Condition

  3. 03

    Trace the Load Path

  4. 04

    Develop the Solution

Engineering Considerations

Conditions Addressed by the Engineering

Construction Equipment

Assessment of temporary equipment loads and concentrated reactions.

Concrete Construction

Assessment of structural conditions associated with staged concrete work.

Temporary Support

Engineering for shoring, reshoring and temporary support arrangements.

Site-Specific Conditions

Engineering response to construction sequences, localized loads and field conditions.

Gallery

PROJECT GALLERY

More Work

Related Projects

Pattullo Bridge Replacement Project — FormworkFormwork

Pattullo Bridge Replacement Project

Surrey–New Westminster, British Columbia

Formwork design review, temporary works verification and field inspection support for construction of the new bridge crossing.

View Project
North Shore Wastewater Treatment Plant — FormworkFormwork

North Shore Wastewater Treatment Plant

North Vancouver, British Columbia

Formwork and shoring engineering, temporary works inspections and construction support for major wastewater treatment infrastructure.

View Project
Surrey–Langley SkyTrain Extension — FormworkFormwork

Surrey–Langley SkyTrain Extension

Surrey–Langley, British Columbia

Formwork and construction engineering support for staged rapid-transit infrastructure construction.

View Project

Start a Conversation

Have a Complex Construction Condition?

Tell us about the structure, construction sequence, equipment and temporary conditions. Our team can help assess the engineering requirements and develop a practical approach for the work.