Vancouver General Hospital – Helipad
All Projects

Healthcare / Existing Structures

Vancouver General Hospital – Helipad

Demolition & Construction Engineering

Structural engineering and demolition sequencing for controlled removal within an active healthcare environment.

Vancouver, British Columbia

Project Overview

Engineering a Structure Through Removal

Element Consulting Engineers provided structural engineering support associated with demolition of the Vancouver General Hospital helipad.

The work required consideration of demolition sequencing, temporary structural conditions and the behaviour of the remaining structure as removal progressed.

Vancouver General Hospital – Helipad — project context

Project Information

Sector
Healthcare / Existing Structures
Location
Vancouver, British Columbia
Primary Service
Demolition & Construction Engineering
Client / Partner
Graham Construction
Categories
Demolition, Construction Engineering, Existing Structures

Engineering Challenge

Removal Above an Operating Hospital

Demolition at roof level within an active healthcare facility limits equipment, access and sequencing. Each removal changes the load path in the remaining structure, so the intermediate conditions govern as much as the final one.

Our Scope

OUR ENGINEERING SCOPE

01 — Demolition Sequencing

02 — Structural Assessment

03 — Temporary Support

04 — Construction Loading

05 — Field Engineering

Engineering Solution

A Sequence That Can Be Built and Verified

ECE assessed the existing structure, developed a removal sequence with the temporary support required at each stage, and supported the work in the field as conditions were confirmed.

Demolition Engineering

Removing a Structure Is Also a Structural Problem

During demolition, a structure passes through a series of intermediate configurations. Load paths can change, restraint conditions can be altered and temporary support may be required as removal progresses.

  1. 01

    Existing Condition

  2. 02

    Proposed Removal

  3. 03

    Intermediate Conditions

  4. 04

    Controlled Implementation

Engineering Considerations

Conditions Addressed by the Engineering

Changing Load Paths

Temporary Stability

Demolition Loading

Field Conditions

Gallery

PROJECT GALLERY

More Work

Related Projects

Broadway Subway Project — FormworkFormwork

Broadway Subway Project

Vancouver, British Columbia

Formwork engineering, temporary works and construction-stage structural support for major transit infrastructure.

View Project
Granville Island Public Market — ScaffoldingScaffolding

Granville Island Public Market

Vancouver, British Columbia

Engineering and inspection of a full temporary roof and scaffold system over the active Granville Island Public Market.

View Project
Pattullo Bridge Replacement Project — FormworkFormwork

Pattullo Bridge Replacement Project

Surrey–New Westminster, British Columbia

Formwork design review, temporary works verification and field inspection support for construction of the new bridge crossing.

View Project

Start a Conversation

Planning Structural Demolition?

Tell us about the existing structure, the proposed removal and the site constraints. Our team can help develop a sequence that can be implemented and verified in the field.